Mather High School

0O5A6772_3_4_5_6_7_8
0O5A6835_36_37_38_39_40_41
0O5A6870_1_2_3_4_5_6
0O5A7115_16_17_18_19_20_21
DSC_0098
0O5A6877_78_79_80_81_82_83
0O5A6947_48_49_50_51_52_53
Mather
Mather Library Addition
0O5A6968_69_70_71_72_73_74
Mather Auditorium
0O5A7059
0O5A6737_38_39_40_41_42_43
DSC_0134
0O5A6772_3_4_5_6_7_8
0O5A6835_36_37_38_39_40_41
0O5A6870_1_2_3_4_5_6
0O5A7115_16_17_18_19_20_21
DSC_0098
0O5A6877_78_79_80_81_82_83
0O5A6947_48_49_50_51_52_53
Mather
Mather Library Addition
0O5A6968_69_70_71_72_73_74
Mather Auditorium
0O5A7059
0O5A6737_38_39_40_41_42_43
DSC_0134

Project details

  • Final Budget: $30,000,000
  • Contract Type: General Contractor
  • Owner: CPS
  • Architect: FGM Architects
  • Location: Chicago, IL

Scope:

Exterior: Library addition, Chiller room & storage room additions, New roof fans, New greenhouse addition, Masonry restoration, Parking lot replacement, New Skylights, New Permeable pavers, New LED sign, New roof drains, New sidewalks, New doors, New curtain wall, New store front, New site work, New ADA ramps, New Landscape & restoration, New iron fencing,

Interior: Complete bathroom rehab, New drinking fountains, New Pool liner, Pool refurbish including new pumps and piping, 11 new air handlers, New BAS controls, Mechanical upgrades, New Chillers, New cooling towers, New high/low temperature supply lines, New VAV boxes in all classrooms, New spiral duct in all classrooms, New hot & cold domestic water lines in the building including the mains, Locker room renovation, electrical service upgrade, new intercom, New concentrator boxes, New distribution panels, New sprinkler, New fire pump, New casework, Electrostatic paint case work, New corridor ceilings, New lights through-out, ADA upgrades, New lockers, New auditorium seating and stage curtain/rigging, New gym floors, New gym bleachers, Interior finishes, New classroom doors & hardware, New VCT floors in classrooms and hallways.

Time frame:

April 2009 thru May 2011

Project Highlights

  • Received Silver LEED certification
  • Zero lost-time injuries
  • Full replacement of the schools mechanical & plumbing
  • Major electrical upgrade with new automated BAS system
  • School fully occupied with students, faculty & staff during construction